Log In     View a printable version of the current page.  

All Projects : Pentaho Design Studio (Key: PDS)

Project Lead: Triage

Release Notes
Planning board
Task board
Chart board

 Select:   Open Issues   Road Map   Change Log   Popular Issues   Calendar   Versions   Components   GreenHopper   

Components

(with open issues in each component)

Versions

(with open issues due to be fixed per version)
Component Action Sequence Editor 50
Component Component Editors 8
Component MQL Editor 2
Component Platform 3
No Component 33
Released   Pentaho 1.6 GA 1
Unreleased   1.7.2.GA 1
Unreleased   SUGAR 21
Unreleased   Future Release 67
Unscheduled 1

Reports

User Workload Report
Version Workload Report
Time Tracking Report
Single Level Group By Report

Preset Filters

- All
- Outstanding
- Unscheduled
- Most important
- Resolved recently
- Added recently
- Updated recently

Project Summary

Open Open 89
   22%
In Progress In Progress 1
Resolved Resolved 5
   1%
Closed Closed 315
   77%
Ready For Test Ready For Test 1

Open Issues

By Priority
Unknown Unknown 1
   1%
Blocker Blocker 4
   4%
Critical Critical 3
   3%
Severe Severe 31
   34%
Medium Medium 44
   48%
Minor Minor 8
   9%

By Assignee
Angelo Rodriguez 23
   25%
Bill Seyler 1
   1%
David Kincade 1
   1%
Future Release 18
   20%
Jared Pshedesky 1
   1%
Kurtis Cruzada 1
   1%
Triage 1
   1%
Will Gorman 1
   1%
Unassigned 44
   48%