Log In     View a printable version of the current page.  

All Projects : Pentaho Design Studio (Key: PDS)

Project Lead: Triage

Release Notes
Planning board
Task board
Chart board

 Select:   Open Issues   Road Map   Change Log   Popular Issues   Calendar   Versions   Components   GreenHopper   

Components

(with open issues in each component)

Versions

(with open issues due to be fixed per version)
Component Action Sequence Editor 42
Component Component Editors 8
Component MQL Editor 1
Component Platform 2
Component Report Design WIzard Integration 4
No Component 13
Unreleased   1.7.2.GA 6
Unreleased   1.7.X.Backlog 8
Unreleased   2.0.Backlog 4
Unreleased   Future Release 46
Unscheduled 3

Reports

User Workload Report
Version Workload Report
Time Tracking Report
Single Level Group By Report

Preset Filters

- All
- Outstanding
- Unscheduled
- Most important
- Resolved recently
- Added recently
- Updated recently

Project Summary

Open Open 67
   20%
Resolved Resolved 13
   4%
Closed Closed 262
   77%

Open Issues

By Priority
Severe Severe 24
   36%
Medium Medium 35
   52%
Minor Minor 8
   12%

By Assignee
Angelo Rodriguez 23
   34%
Enrico Howard 1
   1%
Future Release 18
   27%
Jared Pshedesky 1
   1%
Michael Mest 1
   1%
Unassigned 23
   34%